Usable Energy Formula
Start by converting amp-hours into watt-hours, then apply the planned discharge window and any delivery-loss assumption.
Nominal Wh = battery Ah × nominal voltage
Usable Wh = nominal Wh × (planned DoD ÷ 100)
Delivered Wh = usable Wh × (efficiency ÷ 100)
A 100Ah, 12.8V LiFePO4 example at 80% DoD has 1,024Wh of battery-side usable energy before delivery losses. A 100Ah, 12V lead-acid example at 50% DoD has 600Wh. These percentages are planning examples, not limits for every product.
Required Capacity Formula
When the daily load is known, reverse the same relationship to estimate nominal Ah.
Required Ah = daily load Wh ÷ [nominal V × usable fraction × efficiency]
At 1,200Wh/day and 90% delivery efficiency, using the example assumptions above gives about 130Ah of 12.8V lithium capacity or about 222Ah of 12V lead-acid capacity. The difference comes from both nominal voltage and the chosen discharge window.
For other voltages, compare with the site’s Lithium Battery Voltage Chart and Battery Capacity Calculator.
Cycle Life Needs Context
Cycle ratings only make sense when DoD, temperature, current, charge method, and end-of-life definition are comparable. One current Victron LiFePO4 technical table lists 2,500 cycles at 80% DoD and 5,000 at 50% DoD to at least 80% of nominal capacity. That is a product-specific reference, not a promise for every lithium battery.
For lead-acid, Trojan’s deep-cycle battery FAQ recommends generally discharging 20–50% of rated capacity for optimum life and performance, even though deeper cycling is possible.
Safety, Charging & Temperature
A Lithium vs Lead Acid conversion is a system project, not just a battery swap. Review charger settings, alternator/DC-DC charging, inverter low-voltage thresholds, cable ampacity, fuses, disconnects, mounting, ventilation, and temperature limits.
- Use the exact battery manufacturer’s charge profile and current limits.
- Confirm the lithium BMS can support continuous and surge current.
- Do not equalize a lithium battery unless its manufacturer explicitly requires a procedure.
- Respect low-temperature charging restrictions for LiFePO4.
- Provide the ventilation and service access required for lead-acid designs.
Review the site’s Lithium Battery BMS Guide and Lithium Battery Safety Guide before finalizing a conversion.
Voltage under load can change the real-world comparison
Lead-acid voltage tends to sag more as state of charge falls and current rises, while LiFePO4 usually holds a flatter discharge voltage through much of its usable range. That can matter when an inverter has a low-voltage cutoff or when a large DC load draws high current. A bank may still contain energy yet reach an equipment cutoff earlier than a simple Wh calculation suggests. High-current lead-acid performance is also influenced by the discharge rate, so nameplate Ah measured at a slow test rate should not be assumed to remain identical at every load.
For this reason, use the sizing result as the starting point, then check the inverter’s cutoff voltage, the battery’s discharge curves, continuous and surge-current limits, conductor voltage drop, and connection quality. The site’s Wire Gauge Calculator can help with an initial cable-size and voltage-drop check, but final conductor and fuse selection must follow the actual installation requirements.
Accuracy note: The comparison tool is educational planning math. Real capacity and runtime change with temperature, discharge rate, battery age, state of charge, inverter behavior, voltage sag, BMS cutoffs, cable losses, and load variation. For critical medical, navigation, emergency, or safety systems, use conservative reserve capacity and professionally verified equipment selection.